No. |
Year |
Projects Description |
End User/Owner |
76 |
|
Pekerjaan Perbaikan Tank Condensate di PT. Odira |
PT. Odira |
77 |
|
Soil Resisitivity Measurement, Interpretation and Recommendation For The Proposed 1000ND MSCL Pipeline From Jalan Nyabau to Proposed Kemena R.C. Reservoir, Bintulu. |
Lembaga Air Kawasan Utara (Laku), Bintulu |
78 |
|
Upgrade Water Treatment System At Prabumulih Field |
Pertamina Prabumulih |
79 |
|
“Close Interval Potential Survey (CIPS) f or CP System for NPS30 PGU2 SEC.3 (ML005, Kluang to Plentong M/S) and Straits of Johore Pipeline. “ |
Petronas Carigali Berhad |
80 |
|
“- Retrofit Design for Cathodic Protection for Tiong A to BEC Pipeline. – Retrofit Design for Cathodic Protection for PCSB’s Tiong to Tapis Pipeline. – Retrofit Design for Cathodic Protection for 10” Pipeline from BEA to BEC.” |
Petronas Carigali Berhad |
81 |
|
Review and Study of Cathodic Protection Systems and Related Documents for PMO Pipelines. |
Petronas Carigali Berhad |
82 |
|
Pipeline Integrity Inspection by Non-Contact Magnetometry Tomography Method (MTM) for Petronas Carigali’s Onshore Pipelines at Miri Crude Oil Terminal (MCOT), Sarawak. |
Petronas Carigali Berhad (Sarawak) |
83 |
|
The Reinstatement of Sacrificial Anode CP system for Fuel Oil Pipeline of PDB Bintulu Bulk Depot in Bintulu, Sarawak. |
Petronas Dagangan Berhad |
84 |
|
Improvement of Impressed Current Cathodic Protection System for Buried Pipings at Kemaman Export Terminal. |
Petronas Gas Berhad |
85 |
|
Supply of materials and installation of New Anode Groundbed for Petronas Gas Bhd’s PGU II Sector 2, CP Station 6 at Meru, Klang. |
Petronas Gas Berhad |
86 |
|
Provision to Design, Procurement, Installation, Testing and Commissioning A New TRU for Cathodic Protection to Replace The Existing 50V/10A Export Terminal, Tg. Sulong, Kerteh. |
Petronas Gas Berhad |
87 |
|
“To conduct Close Interval Potential Survey (CIPS) for NPS 36 – PGU III Sec 3 Pipeline, Gurun, Kedah. – from ML420 – ML425 – from ML420 – Perlis Lateral – from TOV438 – ML420 Prai Lateral” |
Petronas Gas Berhad |
88 |
|
Inspection for TNB Generation, Sultan Iskandar Power Plant Underground Gas Pipeline, Pasir Gudang. (4 surveys per year) Tenaga Nasional |
Tenaga Nasional Generation Sdn. Bhd. |
89 |
|
To Revamp, Refurbish, Test and Commissioning Cathodic Protection System for Unit 1 (CW Intake) and Unit 2 (CW Pump House) of Phase 1 Conventional Steam Plant at Stesen Janaelektrik Sultan Iskandar, Pasir Gudang, Johor. |
Tenaga National Berhad (TNB) |
90 |
|
33kV Mala Project – Sudan. Supply of Materials and Testing & Commissioning of Cathodic Protection System. |
WNPO, Sudan/Muhibbah Petrochemical Engineering Sdn Bhd |
91 |
|
Mala Development Project, Package 5-Field Surface Facilities (FSF), Mala, Sudan Supply of Materials and Testing & Commissioning of Cathodic Protection System. |
WNPO, Sudan/Muhibbah Petrochemical Engineering Sdn Bhd |